The University of Southampton
SUSSED News

Road closure on Highfield campus 13 – 14 May

This weekend (Saturday 13 – Sunday 14 May), the one way road between Buildings 28 and 30, Highfield Campus, will be closed to allow for essential repair works to the water supply.

During the works, water supply to Buildings 26 (currently unoccupied), 28 and the north end of Building 27 will be interrupted. The work will be sequenced in such a way as to minimise the period of interruption, which is estimated to last for a maximum of four hours during the afternoon of Saturday 14 May.

Please see below to view a map highlighting the closed section of road:

Estates and Facilities apologise for any disruption caused.

 
Share this post Facebook Google+ Twitter Weibo
Powered by Fruition