Due to a failure of the main gas meter at Highfield, we have planned in emergency maintenance works to replace the gas meter to take place on 30 April 2021 from 09:00.
Southern Gas Network will be completing the works in partnership with National Grid. This will mean a complete shutdown of the heating and hot water to buildings on Highfield Campus.
During the period of 09:00 – 16:00, there will be no heating and hot water to buildings as listed below.
We apologise for the inconvenience for these emergency works and will endeavour to get the heating and hot water up and running as soon as possible.
No Hot Water
Highfield | 5 | FEPS |
Highfield | 7 | FEPS |
Highfield | 9 | FEPS |
Highfield | 27 | FEPS |
Highfield | 32 | FSS/FEPS/Security |
Highfield | 42 | SUSU |
Highfield | 54 | FSS |
Highfield | 56 | FSS |
Highfield | 67 | FELS |
Highfield | 85 | FELS |
No Heating
Highfield | 2 | FSS/FAH |
Highfield | 2A | CLS |
Highfield | 4 | FSS |
Highfield | 5 | FEPS |
Highfield | 6 | Nuffield |
Highfield | 7 | FEPS |
Highfield | 9 | FEPS |
Highfield | 13 | FEPS |
Highfield | 17 | FEPS |
Highfield | 18 | Jubilee Sports Centre |
Highfield | 19 | FEPS |
Highfield | 21 | FEPS |
Highfield | 27 | FEPS |
Highfield | 29 | FEPS |
Highfield | 32 | FSS/FEPS/Security |
Highfield | 34 | FSS |
Highfield | 35 | Estates |
Highfield | 36 | Library |
Highfield | 37 | Administration |
Highfield | 38 | Staff Club |
Highfield | 39 | FSS |
Highfield | 40 | SUSU |
Highfield | 42 | SUSU |
Highfield | 44 | FELS |
Highfield | 46 | FEPS |
Highfield | 52 | TSCH |
Highfield | 54 | FSS |
Highfield | 56 | FSS |
Highfield | 58 | FSS |
Highfield | 67 | FELS |
Highfield | 85 | FELS |